As we plan for the next generation, as well as the thousands of new residents who are currently moving into our neighborhood, we believe God is calling The Summit Church to increase both our seating and our sending capacities by expanding our building in 2020. We’re asking you to join us in two specific ways:

Give

We need to raise $500,000 beyond our normal giving to fund these necessary renovations. We’re asking you to prayerfully consider supporting these efforts by committing to increase your monthly giving and/or giving a one-time gift. Gifts can be given online (via the button below), on a Sunday, or by mail (3300 Larimer St, Denver, CO 80205).

Pray

We’re asking God to move in a way that far exceeds our natural abilities. Please join us in daily prayer as we ask God's provision and power to be displayed within our church for the good of our city. To participate in our 35 days of Prayer & Fasting (beginning on Sunday, September 8th), download The Roots Prayer & Fasting Guide here.

Our Vision

After diligent prayer, fasting, planning, and listening for God’s voice, our pastors and staff have developed a plan for better equipping our space for current and future ministry needs. We believe this plan balances these specific needs with both our financial constraints and our philosophical convictions surrounding the type of church we’re called to be. Our plan prioritizes improvements to three main areas:

Level+1+Cutaway.jpg

Summit Kids

Triple our total Summit Kids’ space to 4300 sq. ft.

Add dedicated Kids’ Lobby & secure Check-In

Construct a total of 7 classrooms + 1 nursing mother’s lounge

3+Worship+Space+-+Downsized.jpg

Worship Space

Increase our total seating capacity from 350 to 500 seats via a mezzanine level

1+Patio+Aerial+-+Downsized.jpg

Front Entrance

Create a welcoming entrance with clearer street visibility

Eliminate slope and drainage hump to ensure a safe outdoor gathering space


Stories

Sermons